Ray Kommidi, P.E., T.E., is a California-licensed Civil and Traffic Engineer with 20 years of experience in traffic, civil, and electrical engineering. His project experience includes the design and management of traffic signal installations and modifications, signing and striping, construction traffic handling, and street and pedestrian lighting. Ray currently serves as Deputy Traffic Design Lead for the East San Fernando Valley Light Rail Transit project and Traffic Design Lead for the Vermont Transit Corridor Bus Rapid Transit (BRT) Project and Metro’s D Line Subway Extension [Section 2: Wilshire/La Cienega to Century City; Section 3: Century City to Westwood]. He has also contributed to LIN Consulting’s work on the Metro ExpressLanes Project and the Exposition Light Rail Design-Build Project in the City of Los Angeles.
His technical experience includes traffic signal preemption calculations and traffic studies using tools such as SYNCHRO, HCS, and TRAFFIX.
