This project was a large-scale undertaking that aimed to alleviate traffic congestion on the pertinent freeways. It involved designing, building, operating, and maintaining ExpressLanes on Interstate 10 (San Bernardino Freeway/ El Monte Busway) and Interstate 110 (Harbor Transitway). LIN Consulting, a sub-consultant on the project, is assisting the prime firm in converting existing HOV lanes to toll ExpressLanes, improving roadway infrastructure, and enhancing transit services and facilities. Specific tasks include: preparing roadway lighting, electrical, and power drop plans; designing fiber optic plans within the Caltrans right-of-way for the toll system; and handling the design of a Ramp Metering System (RMS). LIN Consulting is also charged with preparing traffic signals, temporary traffic signals, street lighting, signing/striping, and worksite traffic control plans for the Cities of Los Angeles, El Monte, Hawthorne, and San Gabriel.
7th Standard Road Widening
The 7th Standard Road Widening project widened the roadway from two lanes to four lanes, constructed a separate parallel bridge…