Pasadena Gold Line Design-build, Pasadena
The Pasadena Gold Line Design-Build Project runs along existing rail right-of-way from Chinatown through Lincoln Heights, Highland Park, South Pasadena, and Pasadena for a length of 14 miles. This project was the first part of the entire 37-mile-long Blue Line Project, which extends to Claremont through the eight communities along the rail right-of-way.
LIN Consulting served as a project traffic engineer and was responsible for the design of roadway lighting, traffic signals, and traffic control plans. Tasks included the design of traffic signal upgrades, signal pre-emptions, various scenarios for street closures, temporary traffic signals, and street lighting at various locations.