Projects
Samples of our past and current projects include:
– Exposition Light Rail Transit Design-Build
– Metro ExpressLanes Design-Build
– Countywide Metro Rapid Signal Priority
– I-5 HOV Improvements Segments 2 and 3
– Los Angeles County Parks Splash Pads
– Cajalco I-15 Interchange Improvement
– San Gabriel Valley Traffic Forum ATMS
– Westside Parkway
– Caltrans District 8, On-Call Electrical Engineering
– City of San Fernando, On-Call Traffic Engineering
– Copper Hill Park
– Firestone Boulevard Downtown Gateway
– Metro ExpressLanes Design-Build
– Countywide Metro Rapid Signal Priority
– I-5 HOV Improvements Segments 2 and 3
– Los Angeles County Parks Splash Pads
– Cajalco I-15 Interchange Improvement
– San Gabriel Valley Traffic Forum ATMS
– Westside Parkway
– Caltrans District 8, On-Call Electrical Engineering
– City of San Fernando, On-Call Traffic Engineering
– Copper Hill Park
– Firestone Boulevard Downtown Gateway
– Heritage Park
– Grand Terrace Baseball Field
– City of Ventura, On-Call Traffic Engineering
– I-215 Improvements Segments 1, 2 and 5
– Metro Orange Line Extension
– Hagemen Flyover
– I-710/Atlantic Corridor ITS
– Lakewood Boulevard Lighting Improvements
– City of Downey, On-Call Traffic Engineering
– Gerald Desmond Bridge Replacement
– Rosedale Highway Widening
– Allstate Recycling Facilities
– Otay Ranch Village 11 Elementary School
– Grand Terrace Baseball Field
– City of Ventura, On-Call Traffic Engineering
– I-215 Improvements Segments 1, 2 and 5
– Metro Orange Line Extension
– Hagemen Flyover
– I-710/Atlantic Corridor ITS
– Lakewood Boulevard Lighting Improvements
– City of Downey, On-Call Traffic Engineering
– Gerald Desmond Bridge Replacement
– Rosedale Highway Widening
– Allstate Recycling Facilities
– Otay Ranch Village 11 Elementary School
– Kimball Foothill Improvements
– Placentia Avenue Grade Separation
– Pasadena Gold Line Design-Build
– Puente Avenue Grade Separation
– 7th Standard Road Widening
– Senior Housing Project
– Allen Avenue Traffic Signal Synchronization
– Thomas Roads Improvement Program (TRIP)
– City of Pomona, On-Call Traffic Engineering
– Wells Fargo Parking Lot Lighting
– Traffic Signal and ADA Improvements at Temple Avenue & Shilo Inn Dwy.
– I-210 Segments 2, 4 and 7
– Placentia Avenue Grade Separation
– Pasadena Gold Line Design-Build
– Puente Avenue Grade Separation
– 7th Standard Road Widening
– Senior Housing Project
– Allen Avenue Traffic Signal Synchronization
– Thomas Roads Improvement Program (TRIP)
– City of Pomona, On-Call Traffic Engineering
– Wells Fargo Parking Lot Lighting
– Traffic Signal and ADA Improvements at Temple Avenue & Shilo Inn Dwy.
– I-210 Segments 2, 4 and 7