Pasadena Gold Line Design-Build

OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA

Pasadena, California

The Pasadena Gold Line Design-Build Project runs along existing rail right-of-way from Chinatown through Lincoln Heights, Highland Park, South Pasadena and Pasadena for a length of 14 miles. This project was the first part of the entire 37 mile-long Blue Line Project, which extends to Claremont through the eight communities along the rail right-of-way.
LIN Consulting served as project traffic engineer and was responsible for the design of roadway lighting, traffic signals and traffic control plans. Tasks included the design of traffic signal upgrades, signal pre-emptions, various scenarios for street closures, temporary traffic signals, and street lighting at various locations.

Services Provided:

Traffic Engineering

back